Waste management planning for the expansion of Pierre-Le Gardeur Hospital

Design and planning  /  Hospital centers

STRATZER / Design and Planning / Expansion of a hospital

Waste management planning for the expansion of Pierre-Le Gardeur Hospital

The expansion project of the Pierre-Le Gardeur Hospital in Terrebonne consists mainly in the construction of an eight-storey tower. This will add 246 beds to the 379 already available. During the design work, the architects enquired about the spaces to be reserved for waste management in the expanded site. Therefore, Stratzer estimated the quantities and volumes of waste while planning for the required infrastructures and spaces. Stratzer also established a diagnosis of the current equipment (i.e. containers, compactors, autoclave) and drafted a waste management plan in accordance with the LEED standard.

Type de service
Design and planning

Marché
Hospital centers, Property developers and managers, Health centers

Détails

Client
CISSS Lanaudière (Health and Social Services Center)

Info
Estimate of waste quantities, planning of the required infrastructures and spaces as well as preparation of a waste management plan to ensure compliance of the hospital with the LEED standard.

STRATZER / Projets récents

STRATZER / Contact

Feel free to ask any question about STRATZER

Contact us for all requests for information on our services and for advice on the management of your residual materials. Our professionals will be happy to answer you.

STRATZER / Montréal

5595, rue Fullum
Montréal, Québec, Canada
H2G 2H5
514-844-7111

STRATZER / Québec

3315, boulevard Sainte-Anne
Québec, Québec, Canada
G1E 3K8
418-353-7177

STRATZER / Toronto

70 Cambridge avenue, #524
Toronto, Ontario, Canada
M4K 2L5
647-849-1088